The Buffalo Speedway concrete panel replacement project between West Orem Dr. to Simsbrook Dr. within the Meredith Manor subdivision began in April with completion anticipated in July 2015. This $260,000 roadway project will improve this portion of Buffalo Speedway that has deteriorated beyond normal maintenance and repair.
Concrete panel replacement is used to rehabilitate severely cracked and broken sections of concrete streets. The Buffalo Speedway concrete panel replacement project involves the design and construction of reinforced concrete pavement, base repair, as well as repairs and improvements to curbs and accessible ramps.
The Buffalo Speedway panel replacement project is an active example of a ReBuild Houston project. The ReBuild Houston Initiative is the City of Houston’s voter approved pay-as-you-go plan to rebuild drainage and street infrastructure. Its goal is to improve quality of life and mobility for residents through the reconstruction and proper maintenance of drainage and street improvements. For questions about this project, e-mail [email protected] or call 832-395-2090.